BOOM PROJECTINTERIOR & ARCHITECTURE
PRE-DESIGN DEVELOPMENTS OF THE ARCHITECTURAL AND DESIGN PROJECT OF THE SUMMER SAUND 2011 FESTIVAL COMPLEX COMPLEX hospitality design by BOOM Studio

Hospitality / Location to be confirmed

PRE-DESIGN DEVELOPMENTS OF THE ARCHITECTURAL AND DESIGN PROJECT OF THE SUMMER SAUND 2011 FESTIVAL COMPLEX COMPLEX

Type

Hospitality

Location

Location to be confirmed

Year

2021

Area

Area to be confirmed

- Case Study

Restaurant / hospitality interior

PRE-DESIGN DEVELOPMENTS OF THE ARCHITECTURAL AND DESIGN PROJECT OF THE SUMMER SAUND 2011 FESTIVAL COMPLEX COMPLEX is a hospitality project in Location to be confirmed, developed around restaurant / hospitality interior. The full case-study narrative is being prepared by the studio team. The work combines material palette to be confirmed with a scope focused on scope to be confirmed, creating a clear atmosphere for daily use, photography and long-term spatial memory.

Spatial task

Restaurant / hospitality interior

Material logic

material palette to be confirmed

Outcome

Atmosphere in progress atmosphere shaped through scope to be confirmed.

Mood

Atmosphere in progress

Materials

  • material palette to be confirmed

Scope

  • scope to be confirmed
PRE-PROJECT RESEARCH ON RECONSTRUCTION OF ARCADIA SANATORIUM IN MORSHIN hospitality design by BOOM Studio

Next project

PRE-PROJECT RESEARCH ON RECONSTRUCTION OF ARCADIA SANATORIUM IN MORSHIN

Open case
SUMMER SAUND 2011% sep% Project development - BOOM Studio